Quantcast
Channel: SCN : Popular Discussions - Software Logistics
Viewing all 308 articles
Browse latest View live

Transport Request copy between systems

$
0
0

Currently we have a ERP landscape consist of DEV/QAS/PRD and there's another ERP system separately copied in the past for reference purpose.

 

Days ago, we required to create a new transport request in the reference system and copy it to a current developement system. Hence, I manually access the file system and copied relevant datafile and cofile of the transport request. However, when I add this TR into the current development system, I realized that the same no. of request w/ different objects and description was already created and released. For that reason, even if I added the new transport request in DEV in STMS, the system still recognize it as the one which is released previously.

 

Is there any ways that I can do to avoid such problem?


SUM SP16 profiles issue (can't save profile)

$
0
0

Dear experts,

 

I'm trying to set up SUM parameters for my system but there is a step I can't pass through.

 

When SUM asks me about central instance profiles I input files like this:

 

http://i.imgur.com/k7ykHVu.png

 

However in this case I have strange messages: Please enter a valid path

 

I have no idea how to deal with this issue:

 

1) Filenames are absoultely correct and they exist in sid/sys/profiles directory

2) I don't have a start profile as I don't need it

 

Is there any way to debug this problem? Can it be related somehow yo security srttings of the server?

 

Thanks!

Sources on B: Drive in SWPM

$
0
0

Boris Zarske, I recently had the opportunity to try out the latest incarnation of SWPM and noticed (and used) the functionality for use of the B: drive when lining up the sources. Thank you! It worked perfectly.

 

Cheers, and keep up the good work,

Matt

deployment of JAVA-Patches with SUM failed, MOPZ has downloaded malicious code

$
0
0

some time ago, we did an upgrade of our doublestack PI-System from NW-PI-700-SPS18 to NW-PI-731-SPS05.

 

Now, i wanted to upgrade this PI-system from NW-PI-731-SPS05 to NW-PI-731-SPS07.

with SUM 1.0 SP10 PL4 we are now failing in the Execution-phase (Downtime):

 

Error in phase 5.6. execution (downtime) of the JAVA-Part

 

F  ********************************************************************************

F  *** ERROR => Node 'deployment' failed with exit code 67.

F  ***

F  *** Please see section 'Failures in the 'deploying offline components' phase'

F  *** in SAP Note 1316652 for additional information and trouble shooting advice.

F  ********************************************************************************

 

and the instance could not start up anymore !?


in sap-note 1316652 there is mentioned a separate sap-note 1550641 for this error

http://service.sap.com/sap/support/notes/1316652

 

in sap-note 1550641 - Update fails-Node 'deployment' failed with exit code 67.           

http://service.sap.com/sap/support/notes/1550641

 

Solution:

A fix cannot be deployed as a patch, because the deployer itself is broken.

The solution is to reset a back up state of the system, to download the new version of the stack from SAP Marketplace, and to rerun the update/upgrade procedure.

 

 

i downloaded the patch-stack (with Solman MOPZ) some days ago,

so MOPZ did download the malicious code of deployment components..... ?!

 

so what to do?

how to set up transport directory

$
0
0

Hi,

 

Currently our SAP landscape consists of 3 boxes, DEV, QA and PROD. We are on ECC 6.0 on RedHat with Oracle 10.2.04 as DB.

 

Currently the /usr/sap/trans directory is common for DEV and QA. But PROD has its own local /usr/sap/trans. Due to this setting we have to manually copy the Data and Cofiles to the PROD /usr/sap/trans from the DEV/QA trans directory and then do the import of transports.

 

To avoid this issue we would like to consolidate /usr/sap/trans and make it as a global directory for the landscape.

 

Questions:

1. What are the steps to do this ?

2. Any impact due to this consolidation ?

3. What will happen to the current import queus in the landscape ?

4. Any precautions to be followed ?

 

Appreciate your help

 

Thanks

 

Param

During SUM Update: java.lang.OutOfMemoryError: GC overhead limit exceeded

$
0
0

Hello Colleagues,

 

during Support Package deployment with SUM for an java only system we receive following error in the last step Finalization 5.0:

 

java.lang.OutOfMemoryError: GC overhead limit exceeded

 

We aren't not able to identify the root cause for this issue.

 

Could someone help us here?

 

Many thanks in advance!

 

Regards,

 

Jochen

DMO-The tool is not running

$
0
0

Hi All,

 

While using the DMO(database migration option) feature in SUM SP9, UI frequently displays the message "Tool start required" and "The tool is not running".

In one of the DMO documents found that restarting the SAP hostagent should help, i have restarted the hostagent and then logged in, same message. Please suggest.

 

Regards,

Ravi A

Stuck in SUM phase READDATA_EXP (EHP8)

$
0
0

Hi there,

 

 

I would like to update a EHP6 System (Linux SLES 11 with Oracle 12) to EHP8. So i created an upgrade stack with the Maintenance Planner. I downloaded all files and started SUM. But i cant get past the phase PREP_INPUT_CHECK/READDATA_EXP. SUM wants me to enter the mount points

of the kit "BS2016_SP01_MID"

 

 

I downloaded the following files:

 

51050610_7 SAP ERP 6.0 EHP8 Upgrade Export I 1/3

51050610_8 SAP ERP 6.0 EHP8 Upgrade Export I 2/3

51050610_9 SAP ERP 6.0 EHP8 Upgrade Export I 3/3

51050610_10 SAP ERP 6.0 EHP8 Upgrade Export II 1/3

51050610_11 SAP ERP 6.0 EHP8 Upgrade Export II 2/3

51050610_12 SAP ERP 6.0 EHP8 Upgrade Export II 3/3

51050610_13 SAP ERP 6.0 EHP8 Upgrade Export III 1/2

51050610_14 SAP ERP 6.0 EHP8 Upgrade Export III 2/2

51050610_15 SAP ERP 6.0 EHP8 Upgrade Export IV

 

2016-04-25 09_34_14-Desktop_MPG - Desktop Viewer.png

 

 

I extracted all of them, but no chance. SUM does not recognize them at all. Although there are no useful entries in the logs (SUM/abap/log). I also downloaded the kernel 7.45, which SUM recognized in phase PREP_INPUT_CHECK/EXTRACTKRN_PRE.

 

 

Does anybody know what to do to get further?

 

 

Thanks in advance

Greetings Stefan


SUM 1.0 SP07 - R3trans in /usr/sap//SUM/abap/exe is too old.

$
0
0

Error-Message from SUM-Tool:

 

The executable R3trans in /usr/sap/EXE/SUM/abap/exe is too old.

It needs a release date of 19.03.13 or later.

 

SUM_R3trans-too-old_2013-06-28_191713.jpg

 

what is this -

the download of the SUM is just new (from June 2013) ?

SUM1.0SP13 patch4 PI upgrade 7.11 to 7.40 error

$
0
0


Friends,

 

We're using SUM1.0SP13 patch4 in order to do a PI upgrade from 7.11(sp13) Kernel 721_EXT_REL v331 to 7.40(sp11) Kernel 7.42 v212

Oracle 11g

AIX 6.1 64-bit

 

 

I took my time to read the SUM GUIDE and these notes:

SUM note 2039311
Oracle note 2039312
AIX note 1780629

NW note 1751237

 

And as a result of reading all the notes/SUMguide I applied many notes / changed PRIOR to starting SUM.

 

 

Once I started SUM, I reached extraction phase and am STUCK on this error:

 

SUM error1.png

 

In case you can't read the attached PIC, I am in phase PREP_INIT/SETSYNC_PREP_STARTED and I am getting an error saying Last error code set: No  synchronization mechanism available

 

I have tried re-running the phase, but no luck, same error.  The logs don't really say much:

 

CURRENTPHASE PREP_INIT/SETSYNC_PREP_STARTED

...started at 20150806114645

# Setting syncpoint PREPARE=STARTED

..finished at 20150806114645 with status ABORTED.

# Error message set: 'No synchronization mechanism available'

...begin dialog at 20150806114658

 

I cannot find any notes/threads or searches that address this issue.

 

I'll open a message if I must, but I'd rather submit here first to see if anyone has an idea!

 

Thanks

 

NICK

SUM - The tool is not running

$
0
0

hi,

 

I am on iSeries (AS400) and upgrading NW 7.4 (ABAP only) SPS9 to SPS14.

 

SUM is SP16(PL2)

 

I had to exit the SUM browser at end of day(with SUM process still running)

and i had daily backup running which prevented a directory being read,

which caused the SUM process to be error-ed out. Now the backup has

completed and all the directories are accessible. When i try to get

into

SUM browser it logs me in with sidadm without any issues, but the

screen

say


The tool is not running

 

When i click next, it says error occurred

 

Error Details :

 

 

Status Code : 503

 

 

Status text : Service Unavailable

 

 

Detailed Message : Message from service : SAPup process exited with

status -1 ,| Check the browser console for more information.

 

 

Any idea on how to fix this issue?

 

 

SAPHOSTAGENT is on the latest version

 

I have restarted saphostagent, also tried to register SUM to hostagent

again. Killed SUMSTART job PGM-SAPup-real from the OS level. None of

these steps helped.

 

 

 

Output of the failed tool:

 

Output of failed tool
execution:EXEC> Starting subprocess with PID 59023 at 20160316143013
  ENV: DIR_LIBRARY=/sapmnt/DBW/exe/uc/as400_pase_64 ENV:
ILE_PATH=/sapmnt/DBW/exe/uc/as400_pase_64:/usr/bin:. ENV:
LIBPATH=/sapmnt/DBW/exe/uc/as400_pase_64 ENV:
PASE_LIBPATH=/sapmnt/DBW/exe/uc/as400_pase_64 ENV:
PASE_LOCPATH=/usr/lib/nls/loc ENV:
PASE_PATH=/sapmnt/DBW/exe/uc/as400_pase_64:/QOpenSys/usr/bin:/usr/ccs/bin:/QOpenSys/usr/bin/X11:/usr/sbin:/usr/bin:.
  ENV: PASE_STDIO_ISATTY=N ENV: PASE_THREAD_ATTACH=Y ENV:
PASE_TZ=<MST>7<MDT>,M3.2.0,M11.1.0 ENV: PASE_USRGRP_LIMITED= 
ENV:
PATH=/sapmnt/DBW/exe/uc/as400_pase_64:/QOpenSys/usr/bin:/usr/ccs/bin:/QOpenSys/usr/bin/X11:/usr/sbin:/usr/bin:.
  ENV: SAPSYSTEMNAME=DBW ENV: dbms_type=db4 ENV: dbs_db4_rdbname=SAPDATA 
  PWD: /SAPDATA/usr/sap/DBW/SUM/abap EXECUTING
/SAPDATA/usr/sap/DBW/SUM/abap/bin/SAPup rootdir=/usr/sap/DBW/SUM/abap
guiconnect=127.0.0.1:54821 Assertion failed: CurrentModuleDef != NULL, file 
SAPupmodule.c, line 186 *** FATAL: Got signal 'SIGABRT' (6)! Please contact the
SAP support! *** FATAL: SAPup got signal in phase '', stack trace written to
dev_SAPup.




SAPupConsole.log:03/16/2016 at 00:53:05- this is last error


Converting 3 entries from 'CHECKS.LOG'

 

 

>> Current module status: continue with phase PREP_GENCHECKS/CONFCHK

Converting 3 entries from 'CHECKS.LOG'

>> Waiting for request handler...

 

 

*** FATAL ERROR: Cannot open '/usr/sap/DBW/SUM/abap/tmp/SAPupDialog.txt': Device busy

Error processing dialog 'DeleteFileFailed'

 

Note- the above issue is what caused the initial error in SUM due the iSeries backup. This directory is accessible now after backup is completed.

Issue while running Sum tool in PREP_INPUT_CHECK/EXTRACTKRN_PRE phase

$
0
0

Hi Experts,

 

Our task it to Upgrade Enhancement pack for SRM EHP2 to EHP4.

 

So we have generated the stack using Maintenance planner and started upgrade using Sum SP15.

 

In  PREP_INPUT_CHECK/EXTRACTKRN_PRE phase getting issue while providing mount points for the DVDs of the kit "BS2016_SP01_MID" required for the procedure.

 

We have downloaded the below upgrade media for SRM Ehp 4 and entered the MID.Xml path

 

srm upgrade media files.PNG

 

getting issue as below...

 

srm upgrade dvd files issue.PNG

 

Can anyone help us to resolve the issue.

 

Regards,

Krishna.M

How to deploy SCA FILE USING SUM

$
0
0

Hi all

 

 

   I want to  deploy SCA file using sum in windows server 2012. what is the procedure to deploy SCA File Using SUM.  Please can any one  guide me to close this issue.

 

Regards

Suresh Chirra

Unable to launch DMO frontend.

$
0
0

Hello,

 

I am performing an upgrade+migration to HDB using the DMO option, however I am unable to launch the frontend using the below URL.

 

Start the DMO Frontend with the following URL – (HTTP/HTTPS)

http://<server>.<domain>.<ext>:1128/lmsl/upgrade/<SID>/doc/gui

https://<server>.<domain>.<ext>:1129/lmsl/upgrade/<SID>/doc/gui

 

I have updated the hostagent to patch 178 and SUM ->

os: NTAMD64

compilation mode: UNICODE

compiled for: 64 BIT

release: 1.0

support package: 9

patch number: 6

native branch: lmt_005

java branch: lmtj_005_REL

assembly time: 2014-02-13 10:27:05

pack version: 35

pack tool version: 1.042

 

 

Other Details

Source :  (SAP ERP 6.0 EHP2 - Kernel 7.20) / Sybase

Target:  (SAP ERP 6.0 EHP7 - AS ABAP 7.40) / HDB

 

After starting the the startup.bat I can see that the SLD controller started successfully:

 

Jun 16, 2014 4:11:45 PM [Info]: *************************

Jun 16, 2014 4:11:45 PM [Info]: Starting Server

Jun 16, 2014 4:11:45 PM [Info]: Reading server configuration.

Jun 16, 2014 4:11:45 PM [Info]: Reading service configuration UseCaseService.

Jun 16, 2014 4:11:46 PM [Info]: Configuring LogManager ...

Jun 16, 2014 4:11:46 PM [Info]: ************************************************

*

Jun 16, 2014 4:11:46 PM [Info]: Starting SL Controller listening on port 4241 ..

.

Jun 16, 2014 4:11:46 PM [Info]: Starting StorageService ...

Jun 16, 2014 4:11:46 PM [Info]: Initializing SecurityManager ...

Jun 16, 2014 4:11:46 PM [Info]: Server certificate fingerprint is 02 C9 7F F9 8B

BE 99 38 C6 FB D4 58 5A 98 2E C0

Jun 16, 2014 4:11:46 PM [Info]: Configuring HTTPManager ...

Jun 16, 2014 4:11:46 PM [Info]: Starting WebstartService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting RoleService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting AlertService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting NotesService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting ProcessService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting MIDService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting FileService ...

Jun 16, 2014 4:11:46 PM [Info]: LogService switched off.

Jun 16, 2014 4:11:46 PM [Info]: Starting MailService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting services ...

Jun 16, 2014 4:11:46 PM [Info]: Starting service "UseCaseService" ...

Jun 16, 2014 4:11:47 PM [Info]: Starting MIDService ...

Jun 16, 2014 4:11:51 PM [Info]: Service "UseCaseService" started

Jun 16, 2014 4:11:51 PM [Info]: Services started.

Jun 16, 2014 4:11:51 PM [Info]: Starting HTTP server listening on port 4239 ...

 

 

Jun 16, 2014 4:11:51 PM [Info]: HTTP server started.

Jun 16, 2014 4:11:51 PM [Info]: SL Controller started.

 

However when I try to access the above link I am unable to launch the frontend, I get the below error:

 

The XML page cannot be displayed

Cannot view XML input using style sheet. Please correct the error and then click the Refresh button, or try again later.


XML document must have a top level element. Error processing resource 'http://hostname:1128/lmls/upgrade/T6...

 

One more thing to be noted that I cannot see the SAPup process running at OS level.

 

Any idea what could be wrong here, I am unable to find any other error in logs.

 

 

Regards

- Avi

Error in phase PREP_INTEGRATION/INITTOOL_PHL

$
0
0

Hi All,

 

I am doing a SP level upgrade for SAP Netweaver 7.5 from SP 000 to SP001.

 

In SUM tool, at the PREP_INTEGRATION/INITTOOL_PHL phase, I am getting an error.

 

SUM tool version: 1.0 SP16_6

 

I am not sure which tool it is referring to.

SUM Upgrade.jpg

 

 

Thanks & Regards,

Gowtham Raj J


Transport Request Backout/Rollback

$
0
0

There are or were several 3rd party transport management software solutions on the market at one time. Most of them offered a capability to automatically backout changes (by request ID).  does anyone know how this would be possible? I would imagine the software would record the version of each object prior to the change in the target system and then if a rollback is requested it would retrieve that version and substitute it for latest version.

 

I'm just curious if anyone has had any experience with these tools or replicating similar functionality. I believe TRANSPORT EXPRESS & REALTECH's TransportManager are some of the remaining software solutions still on the market, the other was bought by Oracle.

SUM SP16 profiles issue (can't save profile)

$
0
0

Dear experts,

 

I'm trying to set up SUM parameters for my system but there is a step I can't pass through.

 

When SUM asks me about central instance profiles I input files like this:

 

http://i.imgur.com/k7ykHVu.png

 

However in this case I have strange messages: Please enter a valid path

 

I have no idea how to deal with this issue:

 

1) Filenames are absoultely correct and they exist in sid/sys/profiles directory

2) I don't have a start profile as I don't need it

 

Is there any way to debug this problem? Can it be related somehow yo security srttings of the server?

 

Thanks!

Error in phase PREP_INTEGRATION/INITTOOL_PHL

$
0
0

Hi All,

 

I am doing a SP level upgrade for SAP Netweaver 7.5 from SP 000 to SP001.

 

In SUM tool, at the PREP_INTEGRATION/INITTOOL_PHL phase, I am getting an error.

 

SUM tool version: 1.0 SP16_6

 

I am not sure which tool it is referring to.

SUM Upgrade.jpg

 

 

Thanks & Regards,

Gowtham Raj J

Unable to launch DMO frontend.

$
0
0

Hello,

 

I am performing an upgrade+migration to HDB using the DMO option, however I am unable to launch the frontend using the below URL.

 

Start the DMO Frontend with the following URL – (HTTP/HTTPS)

http://<server>.<domain>.<ext>:1128/lmsl/upgrade/<SID>/doc/gui

https://<server>.<domain>.<ext>:1129/lmsl/upgrade/<SID>/doc/gui

 

I have updated the hostagent to patch 178 and SUM ->

os: NTAMD64

compilation mode: UNICODE

compiled for: 64 BIT

release: 1.0

support package: 9

patch number: 6

native branch: lmt_005

java branch: lmtj_005_REL

assembly time: 2014-02-13 10:27:05

pack version: 35

pack tool version: 1.042

 

 

Other Details

Source :  (SAP ERP 6.0 EHP2 - Kernel 7.20) / Sybase

Target:  (SAP ERP 6.0 EHP7 - AS ABAP 7.40) / HDB

 

After starting the the startup.bat I can see that the SLD controller started successfully:

 

Jun 16, 2014 4:11:45 PM [Info]: *************************

Jun 16, 2014 4:11:45 PM [Info]: Starting Server

Jun 16, 2014 4:11:45 PM [Info]: Reading server configuration.

Jun 16, 2014 4:11:45 PM [Info]: Reading service configuration UseCaseService.

Jun 16, 2014 4:11:46 PM [Info]: Configuring LogManager ...

Jun 16, 2014 4:11:46 PM [Info]: ************************************************

*

Jun 16, 2014 4:11:46 PM [Info]: Starting SL Controller listening on port 4241 ..

.

Jun 16, 2014 4:11:46 PM [Info]: Starting StorageService ...

Jun 16, 2014 4:11:46 PM [Info]: Initializing SecurityManager ...

Jun 16, 2014 4:11:46 PM [Info]: Server certificate fingerprint is 02 C9 7F F9 8B

BE 99 38 C6 FB D4 58 5A 98 2E C0

Jun 16, 2014 4:11:46 PM [Info]: Configuring HTTPManager ...

Jun 16, 2014 4:11:46 PM [Info]: Starting WebstartService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting RoleService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting AlertService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting NotesService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting ProcessService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting MIDService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting FileService ...

Jun 16, 2014 4:11:46 PM [Info]: LogService switched off.

Jun 16, 2014 4:11:46 PM [Info]: Starting MailService ...

Jun 16, 2014 4:11:46 PM [Info]: Starting services ...

Jun 16, 2014 4:11:46 PM [Info]: Starting service "UseCaseService" ...

Jun 16, 2014 4:11:47 PM [Info]: Starting MIDService ...

Jun 16, 2014 4:11:51 PM [Info]: Service "UseCaseService" started

Jun 16, 2014 4:11:51 PM [Info]: Services started.

Jun 16, 2014 4:11:51 PM [Info]: Starting HTTP server listening on port 4239 ...

 

 

Jun 16, 2014 4:11:51 PM [Info]: HTTP server started.

Jun 16, 2014 4:11:51 PM [Info]: SL Controller started.

 

However when I try to access the above link I am unable to launch the frontend, I get the below error:

 

The XML page cannot be displayed

Cannot view XML input using style sheet. Please correct the error and then click the Refresh button, or try again later.


XML document must have a top level element. Error processing resource 'http://hostname:1128/lmls/upgrade/T6...

 

One more thing to be noted that I cannot see the SAPup process running at OS level.

 

Any idea what could be wrong here, I am unable to find any other error in logs.

 

 

Regards

- Avi

SUM "No synchronization mechanism available" in phase SETSYNC_PREP_STARTED

$
0
0

Hello Gurus,

 

after we've installed Solution Manager 7.1, we started with the upgrade to SP14 with the current SUM 1.0 SP16 (PL8).

 

Problem:

In phase SETSYNC_PREP_STARTED in module PREP_INIT we get the error message:

"No synchronization mechanism available"

 

SUM Error message2.PNG

 

 

After researching we came across with the following thread:

https://scn.sap.com/thread/3781598

 

It seems to us that the colleaque had the same problem. His solution was to use the old method of ./STARTUP with the JAVA view on port 4239 instead of the newer method of ./SUMSTART confighostagent. But i think (or hope) that there must be another solution.

 

 

Log-Files

1. Phases.log

1 ETQ201 Entering upgrade-phase "PREP_INIT/SETSYNC_PREP_STARTED" ("20160502100650")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '03', GwService = 'sapgw03' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_mss_schema=sm2

1 ETQ206 Executing pre-phase DB specific actions 0/1.

1 ETQ200 Executing actual phase 'PREP_INIT/SETSYNC_PREP_STARTED'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'PREPARE'

2 ETQ399 Arg[1] = 'STARTED'

1EETQ399 Last error code set is: No synchronization mechanism available

1EETQ204 Upgrade phase "SETSYNC_PREP_STARTED" aborted with severe errors ("20160502100650")

 

2. SAPup.log

CURRENTPHASE PREP_INIT/SETSYNC_PREP_STARTED

...started at 20160502100650

# Setting syncpoint PREPARE=STARTED

..finished at 20160502100650 with status ABORTED.

# Error message set: 'No synchronization mechanism available'

 

 

What should we do? Do you have any ideas?

 

Thanks in advance!

Schady Sayed

Viewing all 308 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>