Hi Guys.
I have question regarging Upgrade Roadmap for a ERP 6 EHP2 system based on NW 7.01 which I would like to Upgrade to ERP6 EHP7 SP7
Source System is
Windows 2012
SQL Server 2008 R2
EHP2 for ERP 6.0 SPS Level 14
Target System
Windows 2012
SQL Server 2012
EHP7 for ERP 6.0 SP 7 based on NW 7.4 SP 9
During Upgrade checks it says I must Upgrade Database first before continue since DB Release is too low for NW 7.4 SP9 as stated in Note
1951491 - Minimal DB system platform requirements for SAP NetWeaver 7.4 SP08
So, at this point I agree i have to update SQL Server to 2012 before next step
Now, my concern is that my Source System does not have the minimum NW SP level (14) to run under SQL Server 2012 which is 26.
Im currently running SAP Kernel 721 EXT Level 401 which is above mininum
According to Note 1651862 - Release planning for Microsoft SQL Server 2012 that would not be possible
Existing systemsof SAP products that are out of SAP maintenance can be upgraded to SQL Server 2012 in order to prepare a SAP upgrade, if they match the SAP NetWeaver Support Package requirements defined below.
SAP products prior to SAP NetWeaver 7.0 are not supported at all on SQL Server 2012.
Required minimum SAP Netweaver Support Package Stacks (SPSs) for SQL Server 2012 (SAP ABAP, SAP ABAP+JAVA stacks)
SAP NETWEAVER 7.0 - SPS 26 (SAP BASIS 26, SAP BW 28)
SAP EHP1 FOR SAP NETWEAVER 7.0 - SPS 11 (SAP BASIS 11, SAP BW 11)
SAP EHP2 FOR SAP NETWEAVER 7.0 - SPS 11 (SAP BASIS 11, SAP BW 11)
SAP EHP3 FOR SAP NETWEAVER 7.0 - SPS 03 (SAP BASIS 03, SAP BW 03)
SAP NETWEAVER 7.1 - SPS 14 (SAP BASIS SP14)
SAP EHP1 FOR SAP NETWEAVER 7.1 EhP1 - SPS 10(SAP BASIS SP10, SAP BW SP10)
SAP NetWeaver 7.2 - no restriction
SAP NETWEAVER 7.3 - SPS 07 (SAP BASIS 07, SAP BW 07)
SAP EHP1 FOR SAP NETWEAVER 7.3 - SPS 03 (SAP BASIS 03, SAP BW 03)
If your system is running on a SPS lower than the one required above, you have to apply the minimum required SPSbeforeupgrading/migrating to SQL Server 2012.
If you install a NetWeaver product on SQL Server 2012, the required SPS for your product must be appliedimmediatelyafter the installation - see SAP note 1676665, section I for more information.
But performing the Upgrade would be technically possible? I mean not for productive use but technicaly during that time the Database is Upgrade and during SUM Execution.
According to the note it states if you install a Netweaver Product in SQL Server 2012, SPS must be applied immediately, so is kinda ambigous what SAP is saying.